Papers
2023
Kim, M., Lee, D., Kim, T., Oh, S., & Cho, H. (2023). Automated extraction of geometric primitives with solid lines from unstructured point clouds for creating digital buildings models. Automation in Construction, 145, 104642.
Kwon, W., Kim H., Ahn, H., Park, U., Kim, C., & Cho, H. (2023) Analysis of BIM-Based Quantity Take-Off in Simplification of the Length of Processed Rebar. applied sciences, 13(4), 2468.
2022
Kim, H., Ahn, H., Kim, C., Lee, D., Kim, T., Ko, Y., & Cho, H. (2022). Optimal slope cutting algorithm for EPS free-form formwork manufacturing. Automation in Construction, 143, 104527.
Cha, M., Kim, C., Lee, T., Kim, B., Kim, T., Lim, H., & Cho, H. (2022). An Optimal Layout Model of Curved Panels for Using 3D Printing. Sustainability 14(21), 13896.
2021
S Oh, D Lee, M Kim, T Kim, H Cho. (2021). Building Component Detection on Unstructured 3D Indoor Point Clouds Using RANSAC-Based Region Growing. Remote Sensing 13(2), 161.
T Kim, YW Kim, H Cho. (2021). A simulation-based dynamic scheduling model for curtain wall production considering construction planning reliability. Journal of Cleaner Production 286, 124922.
M Kim, T Kim, IH Yeo, D Lee, H Cho, KI Kang. (2021). Improvement of Standards on Fire Safety Performance of Externally Insulated High-Rise Buildings: Focusing on the Case in Korea. Journal of Building Engineering 35, 101990.
T Kim, D Lee, H Lim, UK Lee, H Cho, K Cho. (2021). Exploring research trends and network characteristics in construction automation and robotics based on keyword network analysis. Journal of Asian Architecture and Building Engineering 20(4), 442-457.
M Kim, C Lee, HS Kim, H Cho, S Kim, JW Son. (2021). Fair Practice Evaluation Model for Public Construction Projects: Focusing on the Korean Construction Market. KSCE Journal of Civil Engineering, 1-16.
2020
MW Ryu, SM Oh, MJ Kim, HH Cho, CB Son, TH Kim. (2020). Algorithm for Generating 3D Geometric Representation Based on Indoor Point Cloud Data. Applied Sciences 10 (22), 8073.
D Lee, T Kim, D Lee, H Lim, H Cho, KI Kang. (2020). Development of an advanced composite system form for constructability improvement through a Design for Six Sigma process. Journal of Civil Engineering and Management 26 (4), 364-379.
T Kim, Y Kim, H Cho. (2020). Dynamic production scheduling model under due date uncertainty in precast concrete construction. Journal of Cleaner Production 257, 120527.
T Kim, D Lee, M Cha, H Lim, M Lee, H Cho, KI Kang. (2020). Simulation-Based Lift Planning Model for the Lift Transfer Operation System. Journal of Construction Engineering and Management 146 (9), 04020098.
2019
Lee, D., Lim, H., Lee D., Cho, H., & Kang, K. I. (2019). Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA. International Journal of Concrete Structures and Materials, 13(1), 2.
G Kang, H Cho, D Lee. (2019). Dynamic Lifecycle Assessment in Building Construction Projects: Focusing on Embodied Emissions. Sustainability, 11 (13), 3724.
D Lee, G Kang, C Nam, H Cho, KI Kang. (2019). Stochastic Analysis of Embodied Carbon Dioxide Emissions Considering Variability of Construction Sites. Sustainability, 11 (15), 4215.
D Lee, H Kim, J Sim, D Lee, H Cho, D Hong. (2019). Trends in 3D Printing Technology for Construction Automation Using Text Mining. International Journal of Precision Engineering and Manufacturing, 20 (5), 871-882.
T Kim, UK Lee, SW Kim, H Lim, CW Kim, H Cho, KI Kang. (2019). Flexible Double-cage Hoist for High Operational Efficiency in Tall Building construction. Automation in Construction 96, 280-291.
2018
Baik, H., Kim, M., Lee, S. H., & Cho, H. (2018). Simulation Model for Productivity Analysis of External Insulated Precast Concrete Wall System. Sustainability, 10(1), 105.
Lee, D., Lim, H., Kim, T., Cho, H., & Kang, K. I. (2018). Advanced planning model of formwork layout for productivity improvement in high-rise building construction. Automation in Construction, 85, 232-240.
Kim, T., Lim, H., Kim, C. W., Lee, D., Cho, H., & Kang, K. I. (2018). The Accelerated Window Work Method Using Vertical Formwork for Tall Residential Building Construction. Sustainability, 10(2), 456.
Kim, C. W., Yoo, W. S., Lim, H., Yu, I., Cho, H., & Kang, K. I. (2018). Early-warning performance monitoring system (EPMS) using the business information of a project. International Journal of Project Management, 36(5), 730-743.
Kim, T., Lee, U. K., Kim, S. W., Lim, H., Kim, C. W., Cho, H., & Kang, K. I. (2018). Flexible double-cage hoist for high operational efficiency in tall building construction. Automation in Construction, 96, 280-291.
CW Kim, T Kim, WS Yoo, H Cho, KI Kang. (2018). Optimized Growth Curve for Estimating Performance Measurement Baseline Depended on Domestic Construction Facility Type. KSCE Journal of Civil Engineering, 22 (8), 2691-2701.
2017
Lim, H., Kim, T., Cho, H., & Kang, K. I. (2017). Simulation-based Planning Model for Table Formwork Operation in Tall Building Construction. Journal of Asian Architecture and Building Engineering, 16(1), 115-122.
Lim, H., Lee, J. W., Kim, T., Cho, K., & Cho, H. (2017). Economic Analysis of USN-Based Data Acquisition Systems in Tall Building Construction. Sustainability, 9(8), 1360.
Kim, C. W., Kim, T., Yoo, W. S., Cho, H., & Kang, K. I. (2017). Optimized growth curve for estimating performance measurement baseline depended on domestic construction facility type. KSCE Journal of Civil Engineering, 1-11.
Cho, H. P., Lim, H., Lee, D., Cho, H., & Kang, K. I. (2017). Patent analysis for forecasting promising technology in high-rise building construction. Technological Forecasting and Social Change.
2016
Kim, T., Lim, H., Kim, S. W., Cho, H., & Kang, K. I. (2016). Inclined construction hoist for efficient resource transportation in irregularly shaped tall buildings. Automation in Construction, 62, 124-132.
Choi, Y. S., Lim, I., Kim, T., Cho, H., & Kang, K. I. (2016). Case Study of the Core Structure Succeeding Method for Tall Building Construction. Journal of Construction Engineering and Management, 142(12), 05016017.
2015
Kang, G., Kim, T., Kim, Y. W., Cho, H., & Kang, K. I. (2015). Statistical analysis of embodied carbon emission for building construction. Energy and Buildings, 105, 326-333.
Lim, H., Kim, T., Jung, H. K., Cho, H., & Kang, K. I. (2015). Advanced power supply of construction hoists for supertall buildings. Automation in Construction, 59, 48-58.
Kim, T., Kim, Y. W., & Cho, H. (2015). Customer earned value: Performance indicator from flow and value generation view. Journal of Management in Engineering, 32(1), 04015017.
Kim, C. W., Kim, T., Lee, U. K., Cho, H., & Kang, K. I. (2015). Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. Journal of Construction Engineering and Management, 142(4), 05015019.
2014
Lee, M., Kim, T., Jung, H. K., Lee, U. K., Cho, H., & Kang, K. I. (2014). Green construction hoist with customized energy regeneration system. Automation in Construction, 45, 66-71.
Kim, T., Lim, H., Cho, H., & Kang, K. I. (2014). Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10), 04014049.
Kim, D. I., Yoo, W. S., Cho, H., & Kang, K. I. (2014). A fuzzy AHP-based decision support model for quantifying failure risk of excavation work. KSCE Journal of Civil Engineering, 18(7), 1966-1976.
Cho, D., Cho, H., & Kim, D. (2014). Automatic data processing system for integrated cost and schedule control of excavation works in NATM tunnels. Journal of Civil Engineering and Management, 20(1), 132-141.
2012
Yun, S., Cho, H., Tae, Y., Ahn, B., An, S. H., & Huh, Y. (2012). Productivity analysis of steel works for cost estimation of public projects in Korea. KSCE Journal of Civil Engineering, 16(1), 1-7.
Shin, Y., Kim, T., Cho, H., & Kang, K. I. (2012). A formwork method selection model based on boosted decision trees in tall building construction. Automation in Construction, 23, 47-54.
Yoo, W. S., Lee, H. J., Kim, D. I., Kang, K. I., & Cho, H. (2012). Genetic algorithm-based steel erection planning model for a construction automation system. Automation in Construction, 24, 30-39.
Kim, T., Lim, H., Lee, U. K., Cha, M., Cho, H., & Kang, K. I. (2012). Advanced formwork method integrated with a layout planning model for tall building construction. Canadian Journal of Civil Engineering, 39(11), 1173-1183.
2011
Poursha, M., Khoshnoudian, F., & Moghadam, A. S. (2011). Reliabilty assessment of conceptual cost estimates for building construction projects. International Journal of Civil Engineering, 9(1), 9.
Shin, Y., Cho, H., & Kang, K. I. (2011). Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction. Automation in Construction, 20(5), 550-558.
2010
Choi, H. B., Yi, C. K., Cho, H. H., & Kang, K. I. (2010). Experimental study on the shear strength of recycled aggregate concrete beams. Magazine of Concrete Research, 62(2), 103-114.
Seo, J., Yoo, W. S., Lee, U. K., Kim, C., Kang, K. I., & Cho, H. (2010). Case study of a synchronous hydraulic jack-up system for constructing high-rise residential buildings. Canadian Journal of Civil Engineering, 37(6), 922-926.
Kim, C. J., Yoo, W. S., Lee, U. K., Song, K. J., Kang, K. I., & Cho, H. (2010). An experience curve-based decision support model for prioritizing restoration needs of cultural heritage. Journal of Cultural Heritage, 11(4), 430-437.
2009
Lee, U. K., Kim, J. H., Cho, H., & Kang, K. I. (2009). Development of a mobile safety monitoring system for construction sites. Automation in Construction, 18(3), 258-264.
Shin, Y., Kim, D. W., Kim, J. Y., Kang, K. I., Cho, M. Y., & Cho, H. H. (2009). Application of adaboost to the retaining wall method selection in construction. Journal of Computing in Civil Engineering, 23(3), 188-192.
Kim, D. W., An, S. H., Cho, H., Jeong, J. W., Lee, B. H., Doh, N. L., & Kang, K. I. (2009). Development of conceptual model of construction factory for automated construction. Building and Environment, 44(8), 1634-1642.
Doh, N. L., Lee, K., Chung, W. K., & Cho, H. (2009). Simultaneous localisation and mapping algorithm for topological maps with dynamics. IET control theory & applications, 3(9), 1249-1260.
Lee, G., Kim, H. H., Lee, C. J., Ham, S. I., Yun, S. H., Cho, H., ... & Kim, K. (2009). A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction, 18(7), 865-874.
2008
Shin, Y., An, S. H., Cho, H. H., Kim, G. H., & Kang, K. I. (2008). Application of information technology for mass customization in the housing construction industry in Korea. Automation in Construction, 17(7), 831-838.
2007
An, S. H., Park, U. Y., Kang, K. I., Cho, M. Y., & Cho, H. H. (2007). Application of support vector machines in assessing conceptual cost estimates. Journal of Computing in Civil Engineering, 21(4), 259-264.
2006
Lee, U. K., Kang, K. I., Kim, G. H., & Cho, H. H. (2006). Improving tower crane productivity using wireless technology. Computer‐Aided Civil and Infrastructure Engineering, 21(8), 594-604.
2005
Kim, G. H., An, S. H., Cho, H. H., Seo, D. S., & Kang, K. I. (2005). Improved productivity using a modified table formwork system for high-rise building in Korea. Building and environment, 40(11), 1472-1478.
2004
Kim, G. H., Yoon, J. E., An, S. H., Cho, H. H., & Kang, K. I. (2004). Neural network model incorporating a genetic algorithm in estimating construction costs. Building and Environment, 39(11), 1333-1340.